大中矿业(001203) - 2024年1月16日内蒙古大中矿业股份有限公司投资者关系活动记录表
DZKYDZKY(SZ:001203)2024-01-17 01:04

Group 1: Iron Ore Production and Cost Management - The company operates two main mining bases in Anhui and Inner Mongolia, producing 2.8 million tons of iron concentrate and selling 2.83 million tons in the first three quarters of 2023, both figures higher than the same period last year [2] - Production costs differ due to ore quality; Inner Mongolia's mines have lower costs due to higher ore grades and simpler processing, while Anhui's mines have higher costs due to lower grades and complex processing [2] - The company aims to keep overall production costs low through self-operated mining, technological upgrades, and increased mechanization [2] - Future production capacity for iron ore is projected to reach 20 million tons per year after the completion of three major expansion projects [2] Group 2: Sales Strategy and Market Trends - The company sells its products directly to customers, establishing stable sales channels through annual contracts with fixed customers in surrounding areas [3] - The winter storage trend for iron concentrate is influenced by steel mills' profitability; lower profits lead to reduced winter storage motivation [3] - Despite a downturn in the real estate sector, demand for iron ore remains high due to growth in manufacturing and renewable energy sectors, as well as increased domestic steel exports [3] Group 3: Lithium Mining Projects - The company has initiated projects for lithium extraction in Hunan and Sichuan, with Hunan's project set to process 12 million tons of lithium-containing resources annually, aiming for a production scale of 40,000 tons of lithium carbonate per year [4] - Cost advantages for the Hunan lithium project include the use of magnetic separation and self-sufficient raw materials, which reduce processing costs [4] - The Sichuan project is progressing slower due to extensive exploration needs, with plans to develop a detailed mining and construction plan based on exploration results [4] Group 4: Financial Outlook and Capital Expenditure - The company plans significant capital expenditures in the coming years for lithium and iron ore projects, with no current financial pressure due to strong cash flow from iron ore operations [5] - The Hunan lithium project is expected to commence production before the Sichuan project, providing cash flow support for further developments [5] - The company maintains good relationships with banks to secure loans for project construction as needed [5] Group 5: Production Environment Adaptation - To address high-altitude production challenges in Sichuan, the company plans to locate processing facilities at lower elevations and use TBM tunneling machines to transport ore efficiently [5]