
Group 1 - Canadian Critical Minerals Inc. (CCMI) reported revenues from the sale of stockpiled mineralized material at the Bull River Mine (BRM) project, with provisional payments of approximately USD$247,000 for July 2025 shipments [1][2] - In July 2025, CCMI trucked 1,580 dry metric tonnes of sorted mineralized material to New Afton, which graded 1.86% Cu, 0.71 g/t Au, and 14.4 g/t Ag [1] - Proceeds from the sale will be used to offset ongoing care and maintenance costs at BRM and to support engineering studies for the final permit application to restart mill and underground operations [2] Group 2 - CCMI's main asset is the 100% owned Bull River Mine project, which contains 150 million lbs of copper, along with gold and silver resources [3] - The company also holds a 9% interest in XXIX Metal Corp., which owns the Thierry copper project and the Opemiska copper project [3]