CanAlaska Intersects 9.3 metres of 11.62% eU3O8 On Strike at Pike Zone
CVD(CVV) Newsfile·2024-07-16 11:30
Drillhole WMA082-8 intersected one main interval of 6.87% eU3O8 over 16.9 metres, including 11.62% eU3O8 over 9.3 metres in the basement approximately 25 metres below the unconformity with additional lower grade intervals throughout the hole (Figure 2; Table 1). The unconformity contact between the Athabasca sandstone and underlying basement rocks is interpreted to be at 799.0 metres down hole. The main mineralized zone, starting approximately 24 metres into the basement, is characterized by massive to semi ...