Core Insights - Masivo Silver Corp. has successfully completed drilling Hole No. 5 at the Boston Mine project, targeting a high-grade Gold/Copper Skarn deposit [3] - The company plans to commence drilling Hole No. 6 next week, aiming for a depth of 300 feet to test historical IP anomalies [4] - The Phase 1 drill program consists of 6-8 holes, with a potential Phase 2 program of an additional 8-10 holes being discussed [5][6] Drilling Progress - Hole No. 5 was drilled to a depth of 322 feet, with core samples to be analyzed in a certified lab, with results expected in 6-8 weeks [3] - Significant intercepts were reported from Hole No. 1, including 55 feet of 0.99% Cu, 1.52 g/t Au, and 30.35 g/t Ag starting at 65 feet down [5] - The technical team is evaluating new target areas based on the assay results from the Phase 1 program [6] Future Plans - The company holds a $75,000 drill credit in Mexico and is exploring additional opportunities in both Mexico and the USA to complement the Boston Mine project [7] - The winter drilling in Mexico is seen as advantageous due to potential challenges at the Boston Mine during winter storms [7] - The CEO expressed optimism about the progress at the Boston Mine and the upcoming assay results [7]
Masivo Successfully Drills Hole Number 5 at Promising Skarn Deposit