Core Viewpoint - The article discusses the public announcement of the candidates for the EPC (Engineering, Procurement, and Construction) contract for the 131.25 MW / 525 MWh energy storage project by Shan Investment in Mulei, highlighting the competitive bidding process and the selected contractors [1]. Group 1: Project Overview - The project involves the construction of an electrochemical energy storage station with a capacity of 131.25 MW and 525 MWh, utilizing liquid-cooled lithium iron phosphate battery storage systems [1]. - The project will employ modular design and a 1500V DC system, meeting the requirements for grid-connected energy storage technology [1]. Group 2: Bidding Details - The first candidate, China Energy Engineering Group Xinjiang Electric Power Design Institute Co., Ltd., submitted a bid of ¥365,078,046.70 with a unit price of ¥0.695/Wh [1]. - The second candidate, CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd., bid ¥337,050,000.00 at ¥0.642/Wh [1]. - The third candidate, China Power Engineering Consulting Group Central South Electric Power Design Institute Co., Ltd., offered a bid of ¥416,652,707.20 with a unit price of ¥0.794/Wh [1]. Group 3: Responsibilities of the EPC Contractor - The EPC contractor is responsible for the entire process, including preliminary design, construction drawings, equipment procurement, installation, commissioning, performance testing, and quality assurance during the warranty period [2]. - The contractor must also manage temporary construction roads, transportation of materials, and coordination with local government and communities [2]. - Additionally, the contractor is tasked with handling the necessary procedures for converting the project into an independent shared energy storage station [2].
0.642~0.794元/Wh!陕投木垒131.25MW/525MWh储能项目EPC中标候选人公示
中关村储能产业技术联盟·2024-10-11 05:32