Core Viewpoint - The article discusses the procurement announcement for the "Tianshun Wind Energy 477MW/954MWh Energy Storage System Equipment" project, detailing the requirements for bidders and the project specifications [11][12]. Group 1: Project Overview - The project involves the procurement of energy storage systems for five different projects, with a maximum budget of 600 million yuan [12]. - The delivery deadlines for the various projects range from March 10, 2025, to May 30, 2025 [2][7]. Group 2: Bidding Requirements - Bidders must have independent research and production capabilities for at least one of the following products: battery cells, battery modules, PCS (energy storage inverters), BMS (battery management systems), or EMS (energy management systems) [8]. - Bidders are required to provide proof of contract performance for lithium iron phosphate electrochemical energy storage system integration equipment, with a cumulative contract performance of no less than 200Wh, including at least one contract with a capacity of 10MWh or more [8]. Group 3: Submission Details - The deadline for submitting bidding documents is set for January 15, 2025, at 09:30 AM (Beijing time) [10]. - Bidders must complete the necessary steps before the submission deadline, including registering on the electronic bidding platform [15][21]. Group 4: Qualification Criteria - Bidders must not be listed as untrustworthy on the "Credit China" website or have any significant tax violations [14]. - Joint bids and bids from agents are not accepted, and bidders must be registered manufacturing enterprises in China with the ability to assume civil liability independently [8][13].
天顺风能477MW/954MWh储能系统设备集采招标
中关村储能产业技术联盟·2024-12-26 15:15