Renewable Energy Development in Yishui County - Over 70% of residential rooftops in Shiqian Guanzhuang Village are equipped with solar panels, generating green electricity [1] - The village's total installed solar capacity has reached 2 58 MW, providing "sunshine income" for many villagers [2] - Blue solar panels are widely installed across Yishui County, promoting green development in the revolutionary base area [3] Historical Context and Policy Support - Yishui County, located in the Yimeng Mountain area, is a cradle of the "Red Sister-in-law" spirit and Yimeng spirit [6] - The county was selected as a pilot county for distributed rooftop solar development in 2021 [6] - Local government plans to develop 450 MW of distributed rooftop solar during the 14th Five-Year Plan period [7] Current Renewable Energy Status - As of November 2024, Yishui County's renewable energy installed capacity reached 793 5 MW, accounting for 73 24% of total installed capacity [9] - Renewable energy contributes 63 14% of total electricity generation, with 100% local consumption [9] Innovative Projects and Technologies - Shangxiaozhuang Village has implemented a "zero-carbon village" project with an integrated smart microgrid [10] - The village's 1 065 MW solar power station generates 2 04 million kWh of green electricity annually [10] - The project includes 15 energy controllers and energy storage devices, enabling daytime solar consumption and nighttime energy storage distribution [10]
山东沂水:“红色”沂蒙山 涌动“绿电”新能源
Zhong Guo Jing Ji Wang·2024-12-30 00:43