Collective Mining Expands the High-Grade Ramp Zone by Intersecting 51.95 Metres at 8.38 g/t AuEq Including 18.05 Metres at 16.32 g/t AuEq
Accessibility StatementSkip Navigation The Company currently has five drill rigs operating as part of its fully funded 60,000-metre drill program for 2025. Two additional rigs have been contracted with drilling anticipated to ensue in February. The Ramp Zone is a priority in the 2025 drilling program with up to three rigs targeting the zone simultaneously. Details (see Table 1 and Figures 1-4) Hole APC103-D2 was drilled from mother hole APC-103D in a southwest direction to intersect the Ramp Zone. In what ...