Workflow
国网浦城县供电公司:筑牢防汛保供“安全堤”
Zhong Guo Neng Yuan Wang·2025-04-23 10:04

Core Viewpoint - The company has successfully addressed the damage caused by lightning strikes to the power distribution equipment in Chen Yuanzhi village, ensuring stable electricity supply during extreme weather conditions [1][2]. Group 1: Incident Response - Due to recent severe weather, including thunderstorms and heavy rainfall, the lightning arrester at the Chen Yuanzhi transformer was damaged [2]. - The company utilized drones for inspection and quickly mobilized repair teams to address the issue, completing the replacement of the lightning arrester and other equipment within three hours [1][2]. - Power was restored to 14 households in the village by 11:10 AM after implementing safety measures and using a generator for temporary power supply during repairs [2]. Group 2: Safety Measures and Preparedness - The company has emphasized safety precautions for residents during thunderstorms, advising them to avoid seeking shelter under trees and to ensure electrical safety at home [2]. - To mitigate risks from extreme weather, the company has implemented multiple strategies focusing on safety prevention, risk management, and emergency support [4]. - In April, the company has addressed 22 potential hazards and maintained or replaced 69 sets of lightning, rain, and wind protection facilities, along with reinforcing six locations of power distribution infrastructure [4].