Workflow
Brunswick Exploration Drills 36 Meters at 1.51% and Continues to Extend the Mineralized Footprint of Mirage
Globenewswireยท2025-04-24 11:00

Core Viewpoint - Brunswick Exploration Inc. has reported promising initial results from its 2025 winter drilling campaign at the Mirage Project, indicating significant exploration potential and successful extensions of known mineralized zones [1][3][4]. Company Overview - Brunswick Exploration is a Montreal-based mineral exploration company focused on grassroots exploration for lithium in Canada, aiming to advance a comprehensive lithium property portfolio [15]. Drilling Campaign Highlights - The 2025 winter drilling campaign involved 24 drill holes targeting the Stacked Dyke area, with significant mineralized intervals reported [5][6]. - Notable results include a significant interval of 36 meters at 1.51% Li2O in hole MR-24-102 and 28 meters at 1.32% Li2O in hole MR-25-101, indicating successful extensions of the MR-6 pegmatite and the Stacked Dyke area [5][9]. - The MR-3 dyke was extended by 150 meters to the south, with notable grades of 0.79% Li2O over 12.2 meters and 1.26% Li2O over 7 meters [7]. Mineralization and Geological Insights - The MR-6, MR-3, and Stacked Dyke systems are now connected, forming a major swarm of spodumene-bearing pegmatites covering over 1,000 meters by up to 450 meters [5][6]. - The Stacked Dyke area remains open in multiple directions, suggesting further exploration potential [3][4]. Future Prospects - Brunswick Exploration anticipates a milestone-rich year with more drill results expected from the Mirage Project and a restart of prospecting activities in Greenland [4].