Core Viewpoint - Q2 Metals Corp. has successfully completed its 2025 Winter expansion drill program at the Cisco Lithium Project, with promising results indicating the potential for significant lithium mineralization [2][4][5]. Summary by Relevant Sections Drilling Program Results - The 2025 Winter Program involved 14 drill holes totaling 6,997 meters, with 10 holes intercepting spodumene-bearing pegmatite [3][5]. - The main mineralized zone's strike length has increased from 850 meters to 1,500 meters, indicating a substantial expansion of the mineralized area [4][5]. - Notable drill hole results include CS25-028, which encountered 50.9 meters of continuous spodumene pegmatite, and CS25-036, which had a wide interval of 64.3 meters before being halted due to seasonal constraints [5][10]. Geological and Strategic Position - The Cisco Project is strategically located 150 kilometers from rail access, enhancing its development potential [4]. - The project covers 39,389 hectares and is situated within the Frotet Evans Greenstone Belt, which is known for hosting significant lithium deposits [34]. Upcoming Activities - The company plans to resume drilling in June 2025, focusing on systematically defining the known mineralized zone and conducting additional mapping and sampling [4][10]. - Q2 Metals will participate in several upcoming mining investment conferences, including the 121 Mining Investment Conference and the Canaccord Genuity Global Metals & Mining Conference [29][30]. Metallurgical Testing - Preliminary metallurgical testing aims to produce a spodumene concentrate with over 6% Li2O and low iron content, utilizing traditional lithium pegmatite processing methods [18][20]. Quality Assurance and Analytical Methods - The company employs rigorous QA/QC protocols, including the insertion of quartz blanks and certified reference materials in sample batches to ensure analytical precision [27][26]. Future Exploration Plans - The exploration strategy includes further testing of the southern extension of the main mineralized zone and additional drilling to explore less than 10% of the total land package [10][4].
Q2 Metals Extends Mineralized Zone Strike Length to 1.5 Kilometres and Concludes the 2025 Winter Program at the Cisco Lithium Project in Quebec, Canada