Core Viewpoint - The article highlights the proactive measures taken by Weinan City in Shaanxi Province to combat drought during the critical wheat growth period, ensuring agricultural irrigation and food security. Group 1: Drought Response Measures - Weinan City has initiated a Level IV emergency response to drought, mobilizing resources for effective water management and irrigation [1] - The East Lei Second Phase Pumping Project has implemented large-scale operations to maximize water extraction from the Yellow River, with 35 pumping stations operating at full capacity [1][4] - As of April 24, the irrigation area has reached 1.27 million acres, with a total of 120 million cubic meters of water diverted to support agricultural needs [4] Group 2: Infrastructure and Operations - The Luohe Aqueduct serves as a critical infrastructure for transporting Yellow River water to various irrigation channels and fields [2] - The current flow rate through the aqueduct has reached 24 cubic meters per second, reflecting the increased water allocation to combat drought [3] - Continuous monitoring and maintenance of pumping stations are being conducted to ensure reliable water supply for irrigation [4]
【渭南】35座泵站全开 500余条水渠涌流
Shan Xi Ri Bao·2025-04-28 22:45