Core Viewpoint - The article discusses the implementation of a non-site supervision system for pollution discharge units, focusing on automatic monitoring of electricity usage in production and pollution control facilities to enhance regulatory effectiveness and reduce the burden on enterprises [1][2]. Group 1: Regulatory Framework - The National Ecological Environment Standard "Technical Guidelines for Monitoring Electricity Usage of Pollution Discharge Units" is currently in the consultation phase, aiming to standardize the monitoring of electricity usage in production and pollution control facilities [1][5]. - The guidelines emphasize the establishment of a non-site regulatory system primarily based on automatic monitoring of pollution sources, as outlined in the opinions from the Central Committee of the Communist Party of China and the State Council [1][2]. Group 2: Implementation Challenges - There are existing challenges in monitoring, such as some key emission units lacking the capability to monitor pollutant concentration due to technical limitations [3]. - The current monitoring systems may not comprehensively cover both production and pollution control facilities, leading to regulatory gaps [3][4]. Group 3: Technical Specifications - The guidelines propose specific installation and technical requirements for monitoring systems, including four types of warning rules for abnormal operations of pollution control facilities [5]. - The document stresses the importance of compatibility with existing systems to minimize additional costs and ensure effective data utilization [4][6]. Group 4: Local Standards and Practices - Various provinces, such as Jiangsu and Tianjin, have already established local standards for monitoring electricity usage in pollution discharge units, indicating a growing trend towards standardized practices across regions [5]. - The guidelines encourage local authorities to adopt a pragmatic approach in implementing monitoring systems, ensuring that requirements do not exceed legal limits for non-key units [6].
减少现场执法检查频次,生产和治理全过程将推行用电监控
Di Yi Cai Jing·2025-05-02 03:42