Core Viewpoint - The construction of the Zhoukou Port Central Operation Area is progressing rapidly, aiming to establish a high-standard dedicated container terminal that will enhance the logistics and transportation system in Henan Province and support the development of a convenient maritime transport corridor in Central China [1][2][3]. Group 1: Project Overview - Zhoukou Port Central Operation Area is the first high-standard port project in Central China, designed with 72 production berths and an annual throughput capacity of 29.41 million tons and 1.76 million TEUs [1]. - The project is expected to optimize the logistics system in Henan Province and serve as a crucial support for the "Central Convenient Maritime Transport Corridor" [1]. Group 2: Construction Progress - The construction of the 1, 2, and 3 berths is halfway completed, with plans to finish by the end of May, while the remaining berths are scheduled for completion by the end of September [2]. - The main body of the new embankment and the secondary structure of the command center office building have been completed, with steady progress on the road and yard [2]. Group 3: Infrastructure Development - The dedicated railway line for the Zhoukou Port will connect with major rail lines, enhancing the intermodal transport capabilities of the port [3]. - The project aims to create a modern hub port that integrates road, rail, and water transport, thereby improving the logistics chain and supporting the economic development of the region [3].
公铁水牵手打通“最后一公里”——探访河南周口港中心港区
Jing Ji Ri Bao·2025-05-03 21:58