Core Insights - SunHydrogen, Inc. has contracted The Process Group, LLC for the front-end engineering design of a pilot plant for hydrogen production, which will utilize innovative technologies to produce renewable hydrogen from sunlight and water [1][2] - The pilot facility will be the first of its kind at a larger scale, featuring the company's proprietary photoelectrochemical (PEC) hydrogen panel technology, with construction expected to begin after the engineering design phase concludes in July 2025 [2][3] - The pilot plant aims to be fully operational by late Q4 2025 and will consist of approximately 15 interconnected PEC reactors, each with an active area of 1.92 square meters, serving as a critical test of the technology in real-world conditions [2][3] Company Overview - SunHydrogen is focused on developing technologies to produce green hydrogen, targeting a market projected by Goldman Sachs to exceed $1 trillion annually by 2050 [4] - The company's patented SunHydrogen Panel technology aims to produce low-cost green hydrogen using sunlight and any water source, similar to how solar panels generate electricity [4] - The vision includes becoming a major technology supplier in the hydrogen economy, facilitating emission-free hydrogen production for various industrial applications [4] Collaboration Details - The Process Group will provide comprehensive engineering support, including the integration of PEC modules, fluid system design for electrolyte circulation, and safety compliance through a Hazard and Operability (HAZOP) study [3][7] - Both companies express enthusiasm about the collaboration, emphasizing the potential for scalable and impactful solutions in renewable hydrogen production [3][4]
SunHydrogen Contracts The Process Group for Front-End Engineering Design of 25m2 Renewable Hydrogen Pilot Plant
Globenewswireยท2025-05-05 11:30