Workflow
淄博市车网互动项目集中放电量破1.8万度
Zhong Guo Neng Yuan Wang·2025-05-08 09:25

Core Viewpoint - The V2G (Vehicle-to-Grid) pilot project in Zibo, Shandong, aims to enhance the interaction between electric vehicles and the power grid, promoting renewable energy consumption and improving grid resilience through a two-way energy interaction model [2][5]. Group 1: Project Overview - The Zibo V2G pilot project is one of the first national-scale applications, featuring two demonstration stations: Xinma Wuyue Plaza and Luzhong Morning Post [2]. - The project includes 16 units of 60 kW V2G charging piles and 24 units of 7 kW residential V2G charging piles, achieving a total charging and discharging power exceeding one megawatt [5]. - The project is supported by a cross-disciplinary team formed by the State Grid Zibo Power Supply Company and the Zibo Development and Reform Commission, focusing on V2G technology research and commercial operation systems [2][5]. Group 2: Operational Details - Since the project's launch on April 25, 944 electric vehicles have participated in the discharging activities, with a total discharging volume of 118,367.442 kWh, accounting for 56.51% of the provincial discharging volume [8]. - The "e Qi Fang Dian" activity encourages vehicle owners to participate in discharging during optimal time slots through a pricing incentive and promotional packages [8]. - The system prioritizes the consumption of surplus clean electricity generated from photovoltaic sources, while allowing electric vehicles to discharge back to the grid during peak demand or when renewable supply is insufficient, thus achieving peak shaving and valley filling [5].