Core Viewpoint - Stardust Power Inc. has received a significant update regarding its permitting process, confirming that no industrial wastewater discharge permit is required for its lithium processing facility in Muskogee, Oklahoma, due to its closed-loop water system design [1][2][3]. Group 1: Environmental Responsibility - The closed-loop water system utilized by Stardust Power recycles water during the lithium processing, eliminating wastewater discharge to public treatment facilities or natural waterways [2]. - This environmentally responsible design minimizes dependency on municipal water supplies after the initial filling of the facility's tanks and significantly reduces wastewater generation [2][3]. - The CEO emphasized that the facility's design reflects a commitment to environmental stewardship and sustainable solutions that do not heavily demand local water resources [3]. Group 2: Operational Advantages - The absence of a water permit allows for accelerated project timelines, enabling efficient movement through development and expansion phases [3]. - Reduced regulatory compliance costs are another advantage stemming from the permitting determination [3]. - The careful design work preserves municipal potable water for other community uses and minimizes costs associated with purchasing water [3]. Group 3: Progress on Permitting Milestones - Stardust Power has secured the General Permit for Stormwater Discharges from Construction Activities, allowing construction to proceed [4]. - The company has completed its Stormwater Pollution Prevention Plan (SWPPP) to responsibly manage stormwater and protect the environment [4]. - The Minor Source Air Permit is under technical review after being deemed administratively complete by the Oklahoma Department of Environmental Quality [4]. Group 4: Commitment to Sustainability - Stardust Power is dedicated to sustainable lithium manufacturing, using lithium brines as feedstock and prioritizing water conservation throughout its operations [5]. - The company integrates water stewardship into every stage of its operations, meeting or exceeding regulatory standards while maximizing water reuse and recycling [5]. - The CEO highlighted the importance of building a future-minded supply chain that supports clean energy without compromising community resources [6]. Group 5: Company Overview - Stardust Power is developing a lithium processing facility in Muskogee, Oklahoma, with an anticipated capacity of producing up to 50,000 metric tons per annum of battery-grade lithium [6]. - The company aims to bolster America's energy leadership by building resilient supply chains and trades on the Nasdaq under the ticker symbol "SDST" [6].
Stardust Power Confirms No Industrial Wastewater Permit Required for Oklahoma Lithium Facility