Core Points - The first batch of wind turbine blades, consisting of eight blades each measuring 108 meters in length and weighing 107 tons, has been exported from Jiangyin Port to Europe [1][3] - The efficient loading and transportation of these oversized wind turbine blades were facilitated by customized services from the Fuzhou border inspection station, reducing the port operation time from 72 hours to 48 hours, achieving a 33% increase in operational efficiency [1][3] Industry Development - Fujian Province has been actively promoting the development of the offshore wind power industry, with the Fujian Three Gorges Offshore Wind Power Industrial Park establishing a complete industrial chain that includes wind turbine generators, structural components, assembly, and blade production [3] - The Jiangyin Port has launched a wind energy distribution center, creating a one-stop service platform for the entire wind power industry chain, which includes towers, blades, main engines, and related components [3] - Since December 2022, a total of 27 batches comprising 216 blades have been exported overseas, indicating a growing international demand for wind energy products from the region [3]
福州港江阴港区今年首批风电叶片出口
Zhong Guo Xin Wen Wang·2025-05-14 18:07