Workflow
1小时到武汉,沪渝蓉高铁武宜段开启动态验收
Chang Jiang Ri Bao·2025-05-15 07:43

Core Points - The launch of the first testing train 55103 marks the start of comprehensive testing for the Wuhan to Yichang section of the Shanghai-Chongqing-Rongcheng High-Speed Railway (referred to as "Wuhan-Yichang High-Speed Railway") [1] - The Wuhan-Yichang High-Speed Railway spans 313 kilometers with a design speed of 350 km/h, featuring 88 new bridges and 25 tunnels, with bridges and tunnels accounting for 85% of the total length [3] - The project began construction in September 2021 and is expected to complete track laying by January 2025, followed by a static acceptance phase in April 2025 [3] Group 1 - The comprehensive testing phase includes dynamic acceptance, covering joint debugging, dynamic testing, and operational trials [5] - The China Railway Wuhan Group and construction units will conduct daily adjustments on the "four electrical" systems, ensuring smooth testing [5] - The Wuhan-Yichang High-Speed Railway will significantly reduce travel time from 2 hours to approximately 1 hour, enhancing connectivity for cities along the route [7] Group 2 - After the dynamic acceptance is completed, the world's fastest high-speed train CR450 will conduct operational assessment tests on this line [7] - The railway will connect with the ongoing Yichang to Xingshan high-speed railway and the Zheng-Chongqing high-speed railway, further reducing travel time from Wuhan to Chongqing to around 4 hours [7]