Core Viewpoint - The adjustment of the operational schedule for Metro Line 5 has led to a noticeable reduction in congestion during peak hours, improving the overall commuting experience for passengers. Group 1: Operational Adjustments - The operational hours for Metro Line 5 during weekday morning peak hours have been extended from 8:00-8:40 to 07:50-08:50, with the minimum train interval reduced from 3 minutes to 2 minutes and 50 seconds, resulting in a 10-second reduction per train [1] - This adjustment allows for approximately 18 additional train services to be dispatched during peak hours, increasing the capacity by over 4,000 passengers per hour, raising the hourly capacity from 29,000 to around 33,000, an increase of about 14% [2] Group 2: Route Changes - The route for the small service has been extended from Jiangcun to Yucai North Road, incorporating more stations into the peak schedule, which benefits more passengers, especially at transfer stations like People's Square [2] - The adjustments aim to maximize the existing train capacity to meet the demand of more passengers during peak hours, thereby reducing waiting times for transfers between lines [2] Group 3: Future Plans - The company has plans to further optimize operations based on the arrival of additional trains and actual passenger flow, aiming to provide more convenient and comfortable travel services for citizens [2]
5号线调整首日早晚高峰拥挤程度有所缓解
Mei Ri Shang Bao·2025-05-16 03:14