Core Viewpoint - The Duku Highway, a scenic route spanning 561 kilometers through the Tianshan Mountains, is preparing to reopen for traffic after winter snow removal efforts, showcasing its unique landscapes and geological diversity [1][4][17]. Group 1: Road Conditions and Maintenance - The Duku Highway has 205 kilometers of closed sections requiring snow removal, with the last segment of approximately 500 meters being cleared [4][17]. - Snow depths in some areas can reach up to 6-7 meters, complicating the snow removal process [4][8]. - As of now, a total of 161,000 cubic meters of snow have been cleared, equivalent to the volume of 1.7 Water Cube facilities [8]. Group 2: Snow Removal Equipment and Techniques - The snow removal operations utilize advanced machinery, including rotary snowplows capable of handling snow depths over 2 meters [6][13]. - Various types of snow removal equipment, nearly 10 different kinds, are deployed along the highway to ensure efficient snow clearance [6][8]. Group 3: Geological and Environmental Challenges - The Duku Highway is prone to geological hazards such as landslides and rockfalls, earning it the nickname "Museum of Road Diseases" [9][15]. - The road's construction and maintenance face challenges due to its high-altitude, cold climate, and the presence of permafrost [11][15]. Group 4: Historical Context and Significance - The Duku Highway was completed in 1983, significantly reducing travel distance between northern and southern Xinjiang by nearly half [19]. - The construction of the highway involved significant sacrifices, with 168 builders losing their lives during its development [18][21].
独库公路通车倒计时 准备好“一天游四季”了吗?
Yang Shi Xin Wen·2025-05-17 08:02