Core Insights - The successful grid connection of the first batch of wind turbine units at the Dongying Wind Power Equipment Testing and Certification Innovation Base marks a significant milestone in the wind power equipment industry [1] - The establishment of the testing base addresses the urgent need for large-capacity wind turbine testing and certification, enhancing the industry's capability to meet IEC and national standards [1][2] - The Dongying Economic and Technological Development Zone is actively developing a comprehensive offshore wind power equipment industrial base, attracting numerous projects and forming a complete industrial chain [3] Group 1 - The Dongying Wind Power Equipment Testing and Certification Innovation Base has successfully connected its first batch of wind turbine units to the grid, which is crucial for obtaining grid access permits [1] - The base features 12 testing positions for large-capacity wind turbines and is equipped with infrastructure for design certification, type certification, and grid connection characteristic testing [1] - The base aims to become the world's strongest offshore wind power testing and certification facility, addressing critical challenges in the industry [1] Group 2 - The testing base is strategically located within the Dongying Offshore Wind Power Equipment Industrial Park, leveraging favorable geographical conditions and stable wind resources for effective testing [2] - The base has attracted five of the top domestic wind turbine manufacturers and four accredited testing institutions, facilitating the transition of the Dongying offshore wind power equipment industry towards intelligent, green, and high-end development [2] - The Dongying Economic and Technological Development Zone has signed 35 projects related to the offshore wind power industry, establishing a complete industrial chain from main shafts to assembly [3]
山东东营风电装备测试认证创新基地首批机组成功并网