Core Insights - Jiangning Development Zone is making progress in building a "low-carbon park" as part of the national carbon peak pilot program with the launch of the city's first public institution all-scenario microgrid project [1][2] Group 1: Microgrid Project - The first public institution all-scenario microgrid project is located at the Jiangning Development Zone Management Committee, featuring a fully integrated solar and storage charging station [1] - The charging station allows electric vehicle owners to charge their vehicles quickly, achieving a range of 300 kilometers in just 5 minutes using a 600 kW fully liquid-cooled supercharging pile [1] - The station includes 4 V2G (Vehicle-to-Grid) charging piles for practical operation mode verification, enabling vehicle owners to not only charge but also "sell electricity" [1] Group 2: Renewable Energy Integration - The office building incorporates rooftop photovoltaics, flexible photovoltaics in corridors, and power-generating glass, with a total coverage area of approximately 3,810 square meters and a total installed capacity of 714 kW [1] - The renewable energy projects are expected to generate 875,200 kWh of green electricity annually, saving about 267.12 tons of standard coal and reducing carbon emissions by approximately 667.8 tons each year [1] Group 3: Energy Management and Efficiency - The energy resources are integrated into the Jiangning Development Zone's virtual power plant, which monitors and analyzes real-time data from various energy sources, including solar, storage, and charging [2] - The intelligent microgrid construction aims to create a comprehensive low-carbon development system through technology leadership, scenario demonstration, and refined management [2] - The management committee is promoting energy efficiency through building energy-saving systems, including dynamic management of elevators and optimized office lighting [1][2]
江宁开发区建设“低碳园区”有新进展 全市首个公共机构全场景微电网项目投运
Nan Jing Ri Bao·2025-05-22 02:14