Core Insights - The article highlights the successful performance of the Cangxian Fuyang Wind Farm, which has achieved a utilization rate of 99.8% and is expected to exceed the annual available generation hours by over 15% [1][2]. Group 1: Wind Farm Performance - The Cangxian Fuyang Wind Farm has recorded 1,100 actual operating hours from January to April 2024, with an expected full-year generation of 2,600 hours [1]. - The wind farm utilizes 51 units of EN-220/6.25 and 13 units of EN-182/6.25 wind turbines, demonstrating high performance in low to medium wind speed conditions [1][2]. Group 2: Technology and Innovation - The EN-220/6.25 turbine is part of the Model T platform, which has undergone extensive testing and validation to enhance both economic efficiency and safety [4]. - The platform employs a unique global R&D and multi-level testing verification system, which includes over 1,500 component tests before delivery and extensive post-grid connection testing [4]. Group 3: Operational Efficiency - The Galileo super-perception system installed on each turbine optimizes the overall power generation by considering real-time wind conditions and operational constraints [5]. - Predictive and preventive maintenance strategies are implemented through a health monitoring system, which enhances operational reliability and reduces maintenance costs [5]. Group 4: Market Recognition and Future Outlook - The Model T platform has received type certification for multiple turbine models ranging from 6.X to 10MW, with over 15GW of orders secured across various provinces in China [5]. - The comprehensive approach to design, manufacturing, quality processes, testing, and intelligent monitoring is crucial for the advancement of large wind turbines in the industry [7].
见证长期主义的力量:远景Model T平台批量运行半年,发电量超预期
Zhong Guo Neng Yuan Wang·2025-05-24 03:17