Workflow
津潍高铁东营南站德大线恢复运行
Qi Lu Wan Bao Wang·2025-05-26 02:06

Group 1 - The restoration of the De-Da line at Dongying South Station is a significant milestone for the comprehensive construction of the Jin-Wei high-speed railway, enhancing the transportation network in Dongying City and supporting the national coastal high-speed railway corridor [1][4] - The De-Da railway spans 265 kilometers, connecting Huangheya Station on the Jing-Hu railway to Dajiawa and Dalailong railway, and its successful operation after 229 days of construction improves the efficiency of railway transport in the Shandong coastal economic belt [3] - The construction faced challenges such as tight schedules and complex environments, but innovative measures like safety protection, smart management, and technical breakthroughs were implemented to ensure project progress [3] Group 2 - The new Dongying South Station, with a total construction area of 74,120 square meters and a station building area of 39,996 square meters, features a "line-side + elevated" design and will accommodate a scale of 7 platforms and 20 tracks upon completion [3] - The Jin-Wei high-speed railway, as part of the national "eight vertical and eight horizontal" high-speed rail network, will significantly enhance transportation links between the Shandong Peninsula and major regions such as Beijing, Tianjin, and the Yangtze River Delta, promoting regional resource sharing and economic collaboration [4] - The Dongying Transportation Bureau will continue to strengthen coordination and ensure quality and safety in the construction of the Jin-Wei high-speed railway, aiming to provide robust transportation support for the development of a modern and strong city [4]