Workflow
“轨道上的长三角”崛起关键支点
Xin Hua Ri Bao·2025-05-27 06:57

Core Insights - The construction of Nanjing North Station is a significant project supporting the integration of the Yangtze River Delta region, which is a major national strategy promoted by President Xi Jinping [1] - Nanjing North Station is expected to be operational by October 2027 and will serve as a key hub for high-speed, intercity, and conventional railways, enhancing connectivity in the region [1][2] Group 1: Project Overview - Nanjing North Station has a total construction area of 692,100 square meters and is designed to handle an annual passenger volume of 36.5 million [2] - The station features a unique "3 stations, 16 platforms, and 30 tracks" configuration, filling a transportation gap in the Jiangbei area [2] - The station's design includes a "double light valley + grid-shaped rapid transfer corridor," allowing for zero-transfer between high-speed and metro lines, improving transfer efficiency by nearly 40% [2] Group 2: Technological Innovations - The project employs green technologies, including low-carbon materials and energy-saving techniques, such as the use of high-strength steel to reduce total steel consumption [2] - The construction process incorporates rainwater recycling and solidified soil techniques, along with the installation of 105,000 square meters of photovoltaic panels, generating approximately 3 million kilowatt-hours annually [2] Group 3: Economic Impact - Nanjing North Station will connect six provinces and one city in central and western China, reducing travel time from Nanjing to Hefei to 35 minutes and reshaping the "half-day economic circle" [2] - A planned 14.4 square kilometer economic zone around the station is expected to attract a population of 100,000, driving urban integration in Jiangbei and creating a "dual-core driving" urban structure with Nanjing South Station [2][3] Group 4: Construction Challenges - The construction faces challenges such as complex geological conditions, with a deep foundation pit reaching 24 meters, equivalent to eight stories [3] - The project utilizes "smart monitoring + digital twin" technology to ensure safety, with thousands of high-precision sensors monitoring over 20 key indicators in real-time [3] - Coordination among multiple systems, including high-speed rail, metro, and municipal services, is managed through a "smart brain" dispatch center, enhancing construction efficiency and quality [3]