Workflow
纯度达99.999% 月出氢量近50吨华电铁岭项目实现平稳驭风制氢
Liao Ning Ri Bao·2025-05-28 02:46

Core Insights - The project is the first off-grid green hydrogen initiative in Liaoning, which has been operational since April 20, 2022, supplying over 300 tons of green hydrogen to various sectors including fuel cells and chemicals [1][3] - The project utilizes a large-capacity wind power off-grid hydrogen production technology, achieving international leading standards with a production capacity of 1,000 standard cubic meters of hydrogen per hour [2] - Upon full production, the project is expected to generate approximately 1,123 tons of green hydrogen annually, significantly reducing coal consumption and emissions [3] Group 1 - The project has been supplying nearly 50 tons of hydrogen per month since its commercial operation began [1] - Strict management protocols are in place at the hydrogen filling station, ensuring safety during the filling process [1] - The project is a collaboration between local authorities and central enterprises, marking a significant milestone for the region [1] Group 2 - The hydrogen production facility includes advanced equipment such as alkaline electrolysis units and gas purification systems, achieving hydrogen purity levels of 99.999% [2] - The project leverages local wind energy resources, enhancing wind power utilization to over 90% and hydrogen production efficiency to over 97.5% [2] - Future plans include expanding the application of produced hydrogen into green ammonia, green alcohol, and other sectors like shipping and aviation [3]