Workflow
宁夏首个园区级“源网荷储一体化”项目年底并网运行
Zhong Guo Xin Wen Wang·2025-05-28 16:02

Core Viewpoint - The first park-level "source-network-load-storage integration" project in Ningxia, with a total investment of 620 million yuan, has commenced 115MW photovoltaic construction in the Su-Yin Industrial Park, aiming to enhance the green electricity ratio to approximately 40% by the end of the year [1][2]. Group 1: Project Overview - The project includes a 30MW/60MWh energy storage station and is expected to be connected to the grid by the end of the year [1]. - The project aims to accelerate the clean and intelligent transformation of energy through technological innovation and mechanism reform, integrating the four elements of energy production, transmission, consumption, and storage [2]. Group 2: Economic and Environmental Impact - The 115MW photovoltaic system is projected to generate approximately 220 million kWh annually, with a green electricity price of 0.2930 yuan/kWh, contributing to a reduction in carbon emissions and dependence on fossil fuels [5]. - The project is expected to lower industrial energy costs and promote the transformation and upgrading of the industrial structure, fostering the growth of green and low-carbon emerging industries [3]. Group 3: Future Developments - The Su-Yin Industrial Park is accelerating the construction of green electricity parks, zero-carbon parks, and smart parks, with plans to increase the direct supply of green electricity to new computing centers to 70% and reduce terminal electricity prices to 0.36 yuan/kWh [5].