Core Points - The successful reopening of the De-Da Line at Dongying South Station, constructed by China Railway Construction Engineering Group, supports the comprehensive construction of the Jinwei High-speed Railway and optimizes the regional transportation network, enhancing transportation efficiency [2][3] - The new Dongying South Station features an elevated station design with a total construction area of 74,120 square meters, including a station building area of 39,996 square meters, and consists of 7 platforms and 20 tracks [3] - The Jinwei High-speed Railway is a crucial part of the national "Eight Vertical and Eight Horizontal" high-speed rail network and will significantly improve transportation links between Beijing, Tianjin, and the Shandong Peninsula, promoting regional resource sharing and economic collaboration [3] Construction Challenges and Innovations - The construction team faced challenges such as tight schedules and complex working environments, implementing several innovative measures to ensure smooth progress, including safety protection, smart management, progress control, and technical breakthroughs [3] - A comprehensive safety protection system was established using steel protective sheds for full enclosure of the De-Da Line, ensuring operational safety [3] - A "smart construction site" system was developed for construction simulation and plan optimization, allowing for dynamic adjustments to construction processes [3] Future Development and Commitment - China Railway Construction Engineering Group is committed to high-quality construction, emphasizing integrity, intelligence, technology, and management to create benchmark buildings and drive transportation development in Dongying and surrounding areas [4]
津潍高铁东营南站迎来重要节点
Qi Lu Wan Bao·2025-05-29 21:30