全国首个“20兆瓦时新型填充床储热系统”辅助调峰项目正式投运
news flash·2025-05-30 07:27
Core Insights - The first "20 megawatt-hour new type filling bed thermal storage system" auxiliary peak-shaving project has been officially put into operation at Huadian Shanxi Shuozhou Thermal Power Company, addressing the flexibility issues of coal-fired power generation units [1] - This project represents a significant technological breakthrough in the field of flexibility transformation for coal-fired units, moving beyond traditional power generation and heating models [1] - The new thermal storage system enhances the efficiency and economic viability of thermal power peak-shaving by storing produced thermal energy during low electricity demand periods and releasing it during peak demand for heating or power generation [1]