


Core Viewpoint - The introduction of the first national policy on green electricity direct connection aims to balance efficiency and fairness, facilitating the use of renewable energy and addressing challenges in wind and solar energy consumption [1][2]. Group 1: Policy Overview - The notification represents the first national-level policy for green electricity direct connection, incorporating both incremental and existing projects [2]. - Previous local government attempts in Jiangsu and pilot projects in Xinjiang have laid the groundwork for this policy, which now includes both new and existing renewable energy projects [2]. - Direct connection refers to power lines that connect energy sources directly to users, bypassing the public grid, with a clear physical trace of the supplied electricity [2]. Group 2: Objectives and Benefits - The policy aims to enhance the consumption of renewable energy by requiring that at least 60% of the annual self-generated electricity from direct connection projects comes from renewable sources, with targets increasing to 35% by 2030 [3]. - It addresses the growing demand for green electricity from users, particularly in high-energy industries, by facilitating a transition to low-carbon energy sources [3]. - The policy encourages cost reduction for users by allowing them to self-declare grid capacity and manage their own responsibilities, thus enhancing flexibility and lowering electricity costs [3]. Group 3: Fairness and Efficiency - Green electricity direct connection projects must comply with national regulations regarding transmission and distribution fees, ensuring that local governments do not waive these fees [4]. - The policy promotes the self-regulation of direct connection projects to increase the proportion of self-generated renewable energy, thereby reducing reliance on the public grid and lowering operational costs [4]. - It allows projects to participate in the electricity market, optimizing their energy consumption patterns while ensuring compliance with energy supply requirements [4].