Workflow
宁夏彭阳:“风光一体”助力县域发展
Zhong Guo Jing Ji Wang·2025-06-06 08:08

Group 1 - The Ningxia Huadian Pengyang Green Power Park has successfully connected a 20 MW wind power project to the grid, utilizing new mixed tower technology, filling a gap in the local wind power industry [1] - The project is located in Pengyang County, Ningxia, and is expected to generate an annual output of 61.2 million kWh, achieving an annual output value of 18.8 million yuan, and creating over 240 jobs [1] - Pengyang County is accelerating its green low-carbon energy transition, focusing on building a new energy system and modern power system to drive high-quality county development [1] Group 2 - In the distributed photovoltaic project sector, Pengyang County has introduced Ningxia Yuwei Electric Power Co., Ltd. to construct rooftop distributed photovoltaic systems for enterprises in the Wangwa Industrial Park, adopting a self-consumption model [2] - After the project completion, the electricity price for enterprises will be reduced by 0.09 to 0.14 yuan per kWh compared to existing rates, effectively achieving the goal of lowering electricity costs through the green power park [2] - The county plans to continue leveraging clean electricity to empower rural revitalization, support modern industrial development, and accelerate the construction of the green power park [2]