Workflow
Opus One Gold Obtains 8.96 g/t Gold Over 5.2 m From 165 to 170.2 m Followed By 2.91 g/t Au Over 9.9 m From 179.2 to 189.1m From Hole No-25-14, at 200 Vertical Meters on Its Zone 1 Gold Discovery, Noyell Project and Appoints a New Director
Globenewswire·2025-06-16 13:00

NOT FOR DISTRIBUTION TO U.S NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATESMONTREAL, June 16, 2025 (GLOBE NEWSWIRE) -- Opus One Gold Corp (TSX-V: OOR) (the “Company” or “Opus One”) is pleased to announce that drill hole NO-25-14 from the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, Canada, returned 8.96g/t Au over 5.2 m from 165 to 170.2 m. The mineralized interval represents a true width of approximately 4.2 m within the Zone 1 structure. ...