Core Insights - The Chibougamau Copper-Gold Project in Quebec is showing promising high-grade results, particularly from the Corner Bay deposit, with significant intersections reported [1][5][7] - Cygnus Metals Limited is focused on upgrading resources and assessing production potential, supported by favorable market conditions for copper and gold [2][3][4] Resource Growth and Drilling Results - Recent infill drilling at Corner Bay has yielded results such as 9.1m at 4.4% CuEq, including high-grade intervals of 3.4m at 7.6% CuEq [5][6][7] - The current Indicated Resource at Corner Bay stands at 2.7 million tonnes (Mt) at 2.9% CuEq, while the Inferred Resource is 5.9Mt at 3.6% CuEq [5][16][27] - The total Mineral Resource for the Chibougamau Project includes Measured and Indicated Resources of 3.6Mt at 3% CuEq and Inferred Resources of 7.2Mt at 3.8% CuEq [7][16] Infrastructure and Development Potential - The project benefits from established infrastructure, including a processing facility with a capacity of 900,000 tonnes per annum (tpa), which is the only base metal processing facility within a 250km radius [9][14] - Early engineering studies and permitting processes are underway to streamline future development [8][9] Strategic Focus and Future Outlook - Cygnus is pursuing a dual strategy of resource growth and conversion, with ongoing data compilation to identify additional drill targets [10][14] - The company aims to complete a global Mineral Resource update in Q3 2025, targeting both resource growth and conversion [7][8]
More strong drilling results to feed into coming resource update
Globenewswireยท2025-06-16 23:23