Workflow
Makenita Resources Engages Drilling Contractor for Maiden Drill Program at Hector Silver Project in Ontario
Maiden ReMaiden Re(US:MHLD) Newsfile·2025-06-18 07:01

Core Viewpoint - Makenita Resources Inc. has engaged Vital Drilling Services to initiate its first drilling program at the Hector Silver Project in Ontario, with mobilization already underway and drilling expected to start later this month [1]. Group 1: Project Overview - The Hector Property consists of 126 contiguous unpatented mineral claims covering an area of 2,243 hectares [2]. - The initial drilling phase will target high-priority areas identified through geological interpretation and recent fieldwork, including regions made accessible by wildfire-related clear-cutting [2]. Group 2: Technical Details - The drilling program aims to explore new silver and cobalt targets based on an updated structural model derived from airborne magnetic and VLF-EM surveys conducted from 2017 to 2021, totaling 522.9 line-kilometers [3]. - A significant focus will be on the Block 9 silver anomaly, previously explored by Teck in the early 1970s, which yielded assays of 326 grams per tonne silver (9.5 oz/ton) [4]. - The program will also target the South Keora shaft, a historic high-grade prospect with reported sampling results of 12-15% cobalt and up to 1,000 oz/ton silver from around 1913 [4]. Group 3: Management Insights - Jason Gigliotti, President and CEO of Makenita Resources, emphasized that this drilling marks a significant milestone for the company, aiming to validate historical mineralization and unlock potential value for shareholders [5]. - The Hector Project is positioned as a core strategic asset for Makenita, situated in a historically rich mining district known for silver and cobalt production [5].