Core Viewpoint - The article highlights the critical role of drainage stations in Wuhan during the rainy season, emphasizing the continuous operation and monitoring required to ensure effective flood control and water management in the city [1][3][7]. Group 1: Operational Challenges - The Four New Drainage Station is responsible for flood control over an area of 37.9 square kilometers, requiring staff to work around the clock during heavy rainfall [3]. - Staff members have been on duty for four consecutive days since the onset of the rainy season, ensuring real-time data sharing and coordinated efforts with local authorities [3][4]. - The working environment is described as extremely hot, with temperatures exceeding 40°C due to the operation of three pumps [3][4]. Group 2: Maintenance and Monitoring - Staff conduct hourly inspections of electrical rooms and pump operations, using visual and auditory cues to assess equipment status [3]. - The team employs a method of "intermittent operation" to manage water levels effectively, which increases the frequency of operations but maximizes water safety [7]. - The management has established comprehensive emergency plans and ensures 24-hour staffing at drainage stations to maintain city safety during flood periods [7].
“间歇性开机”灵活抽排积水,他们连续4天“钉”在泵站
Chang Jiang Ri Bao·2025-06-22 01:42