Workflow
珠江防总、珠江委维持防汛Ⅳ级和洪水防御Ⅳ级应急响应
Zhong Guo Xin Wen Wang·2025-06-26 06:53

Core Points - The Pearl River Committee has maintained a Level IV emergency response for flood prevention due to severe rainfall and flooding in the region [1][2] - Significant flooding has occurred in 45 rivers, with the highest water levels recorded since 1958 and 2000 in various locations [1] - The current flood situation remains critical, with ongoing risks of small river floods and geological disasters due to saturated soil conditions [1] Group 1 - The Pearl River Committee is actively monitoring weather changes and flood risks, emphasizing the need for timely implementation of defense measures [2] - There is a focus on strengthening inspections of levees and key flood-prone areas to ensure rapid response to potential hazards [2] - The committee is coordinating the joint operation of the Xijiang reservoir group to alleviate flood pressure in the region [2] Group 2 - Emphasis is placed on the prevention of mountain floods and small river floods, with dynamic adjustments to warning thresholds [2] - The implementation of a disaster warning mechanism is crucial for timely evacuation and safety measures for local populations [2]