Core Points - The Guangzhou Metro announced the completion of the upgrade project for the Guangzhou Tower Station of the Haizhu Tram Line 1, which will officially open on July 1 [1][3] - The opening coincides with the launch of the east and west sections of the Metro Line 10 and Line 12, attracting many passengers to experience the new lines [3] Summary by Sections Station Upgrade Details - The upgraded Guangzhou Tower Station is located on the east side of the Guangzhou Tower, adjacent to the Wealth Wharf, and maintains a similar position to the original Guangzhou Tower East Station [4] - The station's area has been expanded to approximately 1.35 times its original size, transitioning from an open platform to a fenced platform, with the addition of platform doors to separate boarding and alighting areas [9] Design and Features - The design incorporates the "Waterfront White Crane" theme, enhancing the station's aesthetics through updated facades, improved greenery in the track area, optimized signage, and upgraded lighting [7] - New outdoor features include the "Most Beautiful 7 Kilometers" stone path, camera-shaped photo frames, and signage that enhances the visitor experience [11] Future Developments - Once the construction of the Guangzhou Tower Square platform is completed, a direct connection to the tram station will be established, facilitating seamless access between the landmark building and the tram service [14]
广州地铁宣布!新广州塔站,明天启用
Nan Fang Du Shi Bao·2025-06-30 13:12