Group 1 - The construction of the Jinan Sam's Club project is progressing rapidly, with the main structure having been completed, marking a significant acceleration in the commercial upgrade of eastern Jinan [1] - The project has been under construction since December 2024, utilizing a "dual-flow" construction method, completing various phases such as the installation of 1,552 anti-floating anchor rods in 32 days and the steel structure installation in 66 days [1] - The project employs BIM technology to optimize the connection between above-ground and underground structures, significantly reducing the construction cycle for the steel structure [1] Group 2 - The Jinan Sam's Club is located on a site of 30,000 square meters with a total building area of 81,000 square meters, featuring two above-ground floors and three underground floors, including a sales area and auxiliary rooms [2] - The project's strategic location near the planned Phoenix Road elevated highway and the operational Metro Line 6 will create a comprehensive transportation network, enhancing accessibility for shoppers [2] - The ongoing upgrades to the surrounding road network and urban infrastructure are expected to greatly improve the shopping experience for residents, facilitating convenient travel to the store [2]
济南山姆会员商店项目主体结构已全面封顶