Core Viewpoint - China Power Construction Corporation has signed a mining and transportation project contract for the KEBO bauxite mine in Guinea, with a contract value of approximately 5.063 billion RMB [1] Group 1: Project Details - The contract was signed between China Power Construction's subsidiary and Guinea's Kai Bo Huaxing Mining Company, along with Huaxing High-Tech (Beijing) Business Development Co., Ltd [1] - The project is located in the Telimele region of Guinea's Kindia region, specifically in the MADINADIAN area [1] - The main engineering activities include exploration, overburden stripping, waste rock excavation, mining, and transportation within a mining area of 204.37 square kilometers [1] Group 2: Project Specifications - The estimated mining volume for the project is 28 million tons [1] - The land transportation distance is approximately 197 kilometers [1] - The total project duration is around 72 months, with no warranty period specified [1]
中国电建:签署几内亚KEBO铝土矿采矿运输项目合同 合同金额约50.63亿元