Workflow
Aura Announces Preliminary Q2 2025 Production Results

Core Viewpoint - Aura Minerals Inc. reported preliminary production results for Q2 2025, achieving a total of 64,033 gold equivalent ounces (GEO), which is a 7% increase compared to Q1 2025 and consistent with Q2 2024 production levels [1][2]. Production Results - Total GEO produced in Q2 2025 was 64,033, which is a slight decrease of 0% compared to Q2 2024 and an increase of 7% compared to Q1 2025 [3]. - Breakdown of production by mine: - Aranzazu: 22,281 GEO, down 10% from Q2 2024 but up 9% from Q1 2025 [3][6]. - Minosa: 18,039 GEO, down 6% from Q2 2024 and up 2% from Q1 2025 [3][6]. - Almas: 12,917 GEO, up 22% from Q2 2024 and consistent with Q1 2025 [3][6]. - Apoena: 8,219 GEO, down 17% from Q2 2024 and down 7% from Q1 2025 [3][6]. - Borborema: 2,577 GEO, marking the project's first gold pour [3][6]. Factors Influencing Production - Aranzazu's production increase was attributed to higher grades and better recoveries, despite rising gold prices affecting GEO conversion [6]. - Minosa's production increase was due to higher grades processed from mine sequencing [6]. - Almas benefited from improved ore throughput and mine performance, reflecting plant expansion and contractor transition [6]. - Apoena's production decrease was expected due to the investment phase and lower ore grades, with pre-stripping activities ongoing to access higher grades by the end of 2026 [6]. Company Overview - Aura Minerals focuses on the development and operation of gold and base metal projects in the Americas, with five operating assets including mines in Honduras and Brazil, and a copper, gold, and silver mine in Mexico [8].