Core Insights - The article highlights the proactive measures taken by the State Grid Shandong Electric Power Company to ensure stable electricity supply during the peak summer load, particularly in response to extreme heat conditions [2][3][4] Group 1: Electricity Load and Supply - On July 3, the Shandong power grid reached a record load of 114.83 million kilowatts, marking a 310,000-kilowatt increase compared to the highest load in the summer of 2024, occurring one month earlier [2] - The renewable energy output also hit a historical high of 60.79 million kilowatts, with solar power contributing 50.09 million kilowatts and wind power 10.70 million kilowatts, accounting for approximately 53% of the peak load [2] Group 2: Maintenance and Emergency Response - The company completed 527 grid maintenance tasks and launched 12 key summer projects to ensure optimal grid performance ahead of peak load [4] - A total of 132 "zero perception" live working operations and 32 emergency repairs were conducted, preventing power outages for over 9,440 households [1][4] - The company has established 136 emergency repair stations with over 1,000 staff on standby and 19 emergency power vehicles ready for deployment [3] Group 3: Technological Advancements - The use of drones equipped with intelligent navigation systems has improved defect identification rates by 2.6 times, enhancing the efficiency of inspections [3] - The company has signed supply responsibility agreements with 24 power generation enterprises to ensure zero outages and disruptions during the summer peak [3]
持续高温用电负荷创新高 山东多措并举保供电
Xin Hua She·2025-07-05 14:04