Workflow
首艘、首台、首个!本周,我国能源领域上新一批“大国重器”
Yang Shi Xin Wen·2025-07-06 06:04

Group 1: Energy Sector Breakthroughs - The largest thermal power plant in construction, Zhejiang Beilun Power Plant's Unit 8, has successfully commenced operation after 168 hours of full-load trial operation, with an annual power generation capacity of 6 billion kWh [1] - The first domestically built methanol dual-fuel container ship, "COSCO Shipping Yangpu," has completed its maiden voyage and the first domestic green methanol refueling at Yangpu International Container Terminal [3][6] - The world's first 500 MW impulse turbine runner, with a maximum diameter of 6.23 meters, has been successfully developed and will be applied at the Zhala Hydropower Station in Tibet, showcasing significant advancements in hydraulic performance and pressure capacity [8][11] Group 2: Natural Gas and Renewable Energy Developments - China's first full-chain multi-condition deep cold processing plant for natural gas has been fully operational in Sichuan, utilizing low-temperature technology for high-efficiency separation and liquefaction of natural gas, capable of processing 2 billion cubic meters annually [12][13][15] - The first floating photovoltaic project in a full seawater environment has been completed and put into operation in Qingdao, Shandong, covering an area of approximately 60,000 square meters with an installed capacity of 7.5 MW, expected to generate 16.7 million kWh of green electricity annually [15][17][19]