Workflow
当体育激情邂逅电力护航——
Nan Jing Ri Bao·2025-07-07 02:35

Group 1 - The event on July 5 saw over 60,000 fans attending, with significant electricity consumption recorded at the venue, reaching 138,700 kWh and a peak load of 10,142.4 kW, indicating a notable increase compared to the previous week [1][6] - The power supply team from State Grid Nanjing Power Company initiated power supply preparations two weeks prior to the event, ensuring that critical equipment such as lighting, large screens, and sound systems were operational [2][3] - Emergency power supply measures included the deployment of low and medium voltage generators to provide backup in case of power failures, ensuring uninterrupted service during the event [2][3] Group 2 - The economic impact of the event was evident, with surrounding areas experiencing a surge in electricity consumption; for instance, the beer festival area saw an increase of approximately 11,000 kWh, a 21% rise compared to the same period last week [4][6] - Local businesses reported a significant uptick in customer activity, with some establishments experiencing order volumes five times higher than usual, showcasing the event's role in boosting local economic activity [5][7] - The data indicated that the electricity consumption in the vicinity of the event was a clear reflection of the economic vibrancy, with various commercial areas benefiting from the influx of fans and the associated activities [6][7]