Group 1 - The company achieved a record high electricity load of 6.284 million kilowatts on July 5, marking the fourth historical peak this year due to increased demand and weather conditions [1] - The company is focusing on three dimensions: precise operation and maintenance from the grid side, diversified collaboration from the power source side, and meticulous control from the load side to ensure reliable electricity supply [1] - Key projects include the completion of seven summer peak engineering projects, addressing ten major network overload issues, and ensuring optimal operational status of equipment through seasonal maintenance [1][2] Group 2 - The company accelerated the integration of renewable energy projects, achieving a 21% year-on-year increase in capacity connected to the grid, totaling 26.86 megawatts in the first half of the year [2] - The company implemented strategies to optimize local power generation, ensuring an additional output of over 20,000 kilowatts during peak periods by managing 20 local power plants [2] - Innovative load management strategies were introduced, including time-of-use pricing adjustments and demand response initiatives, to guide commercial and residential electricity usage [2][3] Group 3 - The company utilized virtual power plant advantages to create a flexible load resource pool, integrating air conditioning, distributed energy storage, and interruptible industrial loads for precise adjustments [3] - Emergency response capabilities include 136 repair stations and over a thousand personnel on standby, with 19 emergency power generation vehicles ready for deployment [3] - The company is committed to ensuring stable grid operation and reliable power supply during the ongoing high-temperature weather, supporting the high-quality development of the local economy [3]
本年度第四次创历史新高,聊城全力保障电力安全可靠供应
Qi Lu Wan Bao Wang·2025-07-07 06:42