Workflow
Endeavour Silver Produces 1,483,736 Oz Silver and 7,755 Oz Gold (2.5 Million Silver Equivalent Oz) in Q2 2025

Core Viewpoint - Endeavour Silver Corp. reported strong production results for Q2 2025, with a total silver equivalent production of 2.5 million ounces, driven by the integration of the Kolpa operation and steady progress at the Terronera project [1][2][3]. Q2 2025 Production Overview - Consolidated silver production reached 1,483,736 ounces, a 13% increase compared to Q1 2024, attributed to the addition of the Kolpa operation [3][9]. - Consolidated gold production was 7,755 ounces, reflecting a 26% decrease from Q2 2024, primarily due to lower output from the Bolañitos and Guanaceví mines [3][9]. - The Kolpa operation processed 118,896 tonnes of material with a silver grade of 111 grams per tonne, contributing positively to the overall production [6][12]. Mine Operations - Guanaceví mine's throughput was 14% lower than Q2 2024, with silver and gold grades down by 1%, leading to a 17% decrease in silver output and a 16% decrease in gold output [4]. - Bolañitos mine experienced a 17% reduction in throughput compared to Q2 2024, with silver production down by 10% and gold production down by 34% [5]. - The integration of Kolpa is progressing well, with production aligning with management's expectations and contributing to the company's long-term growth strategy [6][8]. Terronera Project Update - The Terronera project is advancing towards commercial production, with daily production averaging 1,400 tonnes per day in late June [8][13]. - The plant has shifted focus to refining operations and processing higher-grade ore to achieve planned metal recoveries [14]. Financial Performance - In Q2 2025, the company sold 1,477,197 silver ounces and 7,706 gold ounces, with significant bullion and concentrate inventories held at the end of the quarter [8][9]. - The company anticipates releasing its Q2 2025 financial results on August 13, 2025, followed by a conference call to discuss the results [18].