Workflow
Emperor Metals Announces Maiden Mineral Resource Estimate for the Duquesne West Project, Quebec
Maiden ReMaiden Re(US:MHLD) Newsfileยท2025-07-09 09:30

Core Viewpoint - Emperor Metals Inc. has announced its initial Mineral Resource Estimate for the Duquesne West Gold Project, indicating a significant increase in gold resources compared to historical estimates [1][3]. Group 1: Mineral Resource Estimate Highlights - The 2025 Duquesne West MRE includes an Inferred Mineral Resource of 26.9 million tonnes (Mt), containing 1.460 million ounces (Moz) of gold at an average grade of 1.69 grams per metric ton (g/t) [2][4]. - The current estimate represents an increase of over 104% from the historical resource, which was 727,000 ounces at a grade of 5.42 g/t [3][4]. - Approximately 44% of the total inferred gold resource is amenable to open-pit extraction, while 56% is potentially mineable via underground methods [6]. Group 2: Exploration and Future Plans - The company plans to conduct a summer drill program of approximately 8,000 to 10,000 meters starting in August to further expand the resource [6]. - The focus for 2025 is to surpass the inferred two-million-ounce mark through systematic exploration [4]. Group 3: Technical Details - The effective date of the 2025 Duquesne West MRE is July 2, 2024, and it was prepared by APEX Geoscience Ltd. [7]. - The MRE includes 292 drillholes with a total of 8,229.31 meters of drilling within the estimation domains [16]. - Gold grades were estimated using Ordinary Kriging with locally varying anisotropy to ensure grade continuity [18]. Group 4: Economic Assumptions - Economic assumptions for the MRE include a gold price of USD $2,300 per ounce, a processing cost of CA$12.5 per tonne, and a general and administrative cost of CA$3.0 per tonne [10].