Workflow
Stellar AfricaGold Confirms Summer Drill Program at Promising High-Grade Gold Target at Structure B Tichka Est, Morocco
TargetTarget(US:TGT) Thenewswireยท2025-07-10 12:05

Core Viewpoint - Stellar Africagold Inc. has made significant progress at its Tichka Est Gold Project in Morocco, with recent field activities confirming priority drill targets and a summer drilling campaign set to commence [1][4]. Group 1: Drill Program Details - The company is initiating a 10-hole, 1,500-metre diamond drill program at Structure B, targeting four primary areas [2]. - Structure B is characterized by three mineralized horizons and at least two shear zones, with high-grade gold intersected in dioritic sills and intrusive dykes [2][6]. - The drilling program is expected to focus on NE-trending brittle structures and gently NE-dipping shear corridors, with the first drill campaign scheduled for July 2025 [6][8]. Group 2: Structural Interpretation - A detailed structural interpretation at Structure B has clarified the controls of gold mineralization, indicating that steeply W-dipping fractures and NE shears are significant [3]. - The analysis suggests that carbonate-sill contacts and dykes may host additional gold mineralization along the hinge of the anticline [3]. Group 3: Recent Sampling Results - Recent chip sampling yielded significant gold grades, including a notable 102 g/t Au from the Diorite Sill and other high-grade samples from Structures A and B [14]. - The ongoing mapping and sampling campaign has revealed new high-grade vein systems, reinforcing the exploration potential of the Tichka Est property [13][14]. Group 4: Infrastructure Development - Construction of new access roads and drill platforms is ongoing, with several platforms now complete despite challenging conditions [7]. - The company has selected a drilling contractor and signed a definitive drilling contract, with mobilization activities currently in process [8].