Core Viewpoint - The company effectively responded to Typhoon "Danas" by mobilizing repair teams and utilizing advanced technology to ensure the safety and reliability of the power supply in the affected areas [1][2]. Group 1: Response to Typhoon - The company deployed 5 repair teams, consisting of 53 personnel and 10 repair vehicles, to address the impact of Typhoon "Danas" [2]. - A total of 400kW low-voltage generator and two additional generators (30kW and 50kW) were allocated to support the repair efforts [2]. - The company completed repairs at all 5 fault points by July 9 at 13:50, ensuring stable operation of the power grid and reliable electricity for residents [2]. Group 2: Technology Utilization - The company employed drones to inspect power lines, which significantly improved the efficiency of fault detection by quickly identifying issues such as fallen trees and abnormal wires [1]. - The use of drones allowed for precise fault location, facilitating a more effective response to the challenges posed by the typhoon [1]. Group 3: Safety Measures - The company prioritized safety by addressing a critical situation where a fallen tree posed a risk to power lines, ensuring that the tree was removed and the lines were secured [1]. - Continuous monitoring and rapid response to multiple fault points were crucial in maintaining the safety of the power supply during the storm [1].
国网建阳供电公司:火速抢修受台风影响线路,保用户稳定用电
Zhong Guo Neng Yuan Wang·2025-07-11 08:46