Workflow
云南巧家县:绿能强劲水韵宜人
Jing Ji Ri Bao·2025-07-13 08:53

Core Insights - The Baihetan Hydropower Station, a major national project for "West-to-East Power Transmission," has a total installed capacity of 16 million kilowatts, making it the second-largest hydropower station in the world. It has generated over 196 billion kilowatt-hours of electricity in four years, saving over 59 million tons of standard coal and reducing carbon dioxide emissions by over 160 million tons [1] Group 1: Economic Impact - The construction of the Baihetan Hydropower Station has significantly raised the water level of the Jinsha River in Qiaojia County, Yunnan Province, creating a reservoir with a capacity of 20.6 billion cubic meters, which has positively impacted local climate and ecology [1] - Qiaojia County's tourism industry has flourished, leveraging the hydropower station's attraction, with a focus on developing diverse tourism activities that include water sports, health retreats, and leisure vacations [1] Group 2: Infrastructure Development - A 13-kilometer-long riverside recreational and ecological corridor has been established in Qiaojia County, providing a multifunctional space for residents and tourists, which includes sports parks and wetland parks [2] - The development of the "Seven Mile Water Power Paradise" has attracted significant tourist interest, generating revenue of 3.5 million yuan in its first year and creating over 50 job opportunities for local residents [2] Group 3: Future Prospects - In 2024, Qiaojia County is expected to receive 5.42 million domestic tourists, achieving a tourism revenue of 5.67 billion yuan, reflecting year-on-year growth of 2.94% and 3.52% respectively [3] - The county plans to further develop its tourism brand "Water Rhythm Qiaojia" by focusing on water-based leisure, hydropower education, health retreats, and hot spring vacations [3]